GOVERNMENT OFANDHRA PRADESH
A B S T R A C T
Works - Roads andBuildings Department - Works taken up under NABARD loan assistance under RIDF-V -Administrative sanction - Orders - Issued.
TRANSPORT, ROADS& BUILDINGS (ROADS.I) DEPARTMENT
G.O.Ms.No.49. Dated:13-3-2000.
Readthe following:-
1. Govt.D.O.Lr.No.6952/R.I(1)/99-2, TR&B Deptt., dt.19-5-99.
2. Govt. D.O.Lr.No.2368/R.I(1)/99-7, TR&B Deptt., dated: 6-7-99.
3. G.O.Ms.No.218, TR&B Deptt., dated: 2-11-99.
4. G.O.Ms.No.227, TR&B Deptt., dated: 27-11-99.
5. From the CGM, NABARD, Mumbai,
Lr.No.NBSPD/1385/RIDF-V(AP)/33PSC/99-2000, dated: 4-1-2000.6. From the CE(R&B) Nabard, Hyderabad, Lr.No.1336/EE(N)/DEE.I/99,
dated: 5-1-2000.7. G.O.Ms.No.11, TR&B (R.I) Department, dated: 24-1-2000.
O R D E R:
In thereference first and second read above, Government have furnished a list of 121 works at anestimated cost of Rs.164.40 Crores to General Manager, NABARD for consideration underRIDF-V to be financed by the NABARD.
2. In the referencesthird, fourth and seventh read above, Government have accorded administrative sanction for17 road projects and 19 bridges projects costing Rs.5121.80 Lakhs for loan assistanceunder RIDF-V which were already cleared in the NABARD.
3. In the reference fifthread above, the Chief General Manager, NABARD, Mumbai has sanctioned loan assistance for 2road works and 8 bridge projects with an estimated cost of Rs.1086.00 Lakhs pertaining toRoads and Buildings Department under RIDF-V.
4. In the reference sixthread above, the Chief Engineer (R&B) NABARD has submitted proposals accordingly toaccord administrative sanction.
5. The Government aftercareful examination of proposals of the Chief Engineer (R&B) NABARD, Hyderabad, herebyaccord administrative sanction for 2 road projects costing Rs.194.00 Lakhs and 8 bridgeprojects costing Rs.892.00 Lakhs i.e. totally costing Rs.1086.00 Lakhs (Rupees OneThousand and Eighty Six Lakhs only) for loan assistance under RIDF-V which were alreadycleared by the NABARD as detailed in the Annexure-I and II appended to this order.
6. The expenditure on theabove works sanctioned by the NABARD shall be met from the following Head of Account:
"MH 5054 - Capital outlay on Roads & Bridges
04 - District and other Roads
MH 800 - Other expenditure Schemes included in the plan
SH (20) - Improvement of Roads and Development of Rural Roads under RIDF-V (to be opened)".
7. This order issues withthe concurrence of Finance and Planning (FW.EBS.XVII) Department vide theirU.O.No.4805/111/Exp.PWD/2000, dated: 23-2-2000.
(BY ORDER AND IN THE NAMEOF THE GOVERNOR OF ANDHRA PRADESH)
S.BHALERAO
SECRETARY TO GOVERNMENT
To
The General Manager, NABARD, Regl. Office, 1-1-61, RTC "X" Roads, Hyderabad.
The Chief Engineer (R&B) NABARD, Hyderabad.
The Engineer-in-Chief (R&B) Roads, Hyderabad.
Copy to:
The DS to C.M.
The P.S. to M(R&B).
All Roads Sections.
The Finance & Planning (FW.EBS.XVII) Department.
The Finance & Planning (FW.BG) Department.
SF/Sc
//forwarded by order//
SECTIONOFFICER
A N N E X U R E -I
Annexure to theG.O.Ms.No.49, T.R.&B (R.I) Department, dated: 13-3-2000.
LIST OF ROAD WORKSADMINISTRATIVELY SANCTIONED UNDER RIDF-V
| S.No. | Name of the District/Name of the Road work | Estimated Cost (Rs. in Lakhs) |
| 1. | CHITTOOR DISTRICT | |
| Improvements to Kallupalli - Chowdepalli road to Punganur to Palamanur road (Via) A.Kotha Kota from Km. 0/0 to 12/2. | 100.00 | |
| MAHABUBNAGAR DISTRICT: | ||
| 1. | Improvements to NH.7 to Venkatapuram road from Km.4/2 to 10/833. | 94.00 |
Total: | 194.00 |
S.BHALERAO
SECRETARY TO GOVERNMENT
A N N E X U R E -II
Annexure to theG.O.Ms.No.49, T.R.&B (R.I) Department, dated: 13-3-2000.
LIST OF BRIDGE WORKSADMINISTRATIVELY SANCTIONED UNDER RIDF-V
| S.No. | Name of the District/Name of the Road work | Estimated Cost (Rs. in Lakhs) |
| 1. | CHITTOOR DISTRICT | |
| Construction of High Level Bridge across Vagu in Km.21/8 of Madanapalle - Kandur road. | 29.00 | |
| CUDDAPAH DISTRICT: | ||
| 1. | Construction of Causeway across river Sagileru on Boyanapalli - Mandupur - Atlur road. | 109.00 |
| 2. | Construction of vented causeway in Km.8/350 to 8/550 of Korrapadu - Tangutur road. | 66.00 |
| 3. | Construction of HLC across Pennar river on Appayapalli - Etur road connecting Kamalapuram road. | 420.00 |
| 4. | Construction of vented causeway across Mandavya river in Km.13/2-6 of Rayachoti - Gadikota road. | 148.00 |
| KRISHNA DISTRICT: | ||
| 1. | Reconstruction of bridge across Ratnakoduru drain at Km.12/6 of Nagayalanka - Koduru road. | 62.00 |
| SRIKAKULAM DISTRICT: | ||
| 1. | Reconstruction of bridge at Km.24/8 of Mahendratanaya - Milliaputti road. | 25.00 |
| VISHAKAPATNAM DISTRICT: | ||
| 1. | Construction of High Level Bridge at Km.10/8 of Sirasapalli - Thotada. | 33.00 |
S.BHALERAO
SECRETARY TO GOVERNMENT