GOVERNMENT OFANDHRA PRADESH

A B S T R A C T

Works - Roads andBuildings Department - Works taken up under NABARD loan assistance under RIDF-V -Administrative Sanction - Orders - Issued.


TRANSPORT, ROADS& BUILDINGS (ROADS.I) DEPARTMENT

G.O.Ms.No.11.                                                        Dated:24-1-2000.
                                                                        Readthe following:-

1. Govt.D.O.Lr.No.6952/R.I(1)/99-2, TR&B Deptt., dt.19-8-99.

2. Govt. D.O.Lr.No.10510/R.I(1)/99-2, TR&B Deptt., dt.6-8-99.

3. From the CGM, NABARD, Mumbai,
    Lr.No.NB.SPD/1117/RIDF-V(AP)32PSC/99-2000, dated: 1-11-99.

4. G.O.Ms.No.218, TR&B (R.I) Deptt., dated: 2-11-99.

5. From the CE(R&B) NABARD, Hyd. Lr.No.1336/EE(N)/DEE.I/99,
   ated: 9-11-99.

6. G.O.Ms.No.227, TR&B (R.I) Deptt., dated: 27-11-99.

O R D E R:

    In thereferences first and second read above, Government have furnished a list of 100 works atan estimated cost of Rs.1013.10 Lakhs, construction of bridge at Km.12/6 at Pyna-Kakinadaroad at a cost of Rs.31.00 Lakhs and improvement of Mogalthur - Bhimavaram road from 0/0to 6/0 including construction of a minor bridge at Km.3/2 for Rs.193.00 Lakhs.

2. In the refverencesfourth and sixth read above, Government have accorded administrative sanction for 8 roadprojects costing Rs.857.40 Lakhs and 10 Bridge Projects costing Rs.1258.80 Lakhs i.e.totally costing Rs.2116.20 Lakhs and also 3 Road Projects costing Rs.246.00 fLakhs and 7bridge projects costing Rs.1970.60 Lakhs i.e. totally costing Rs.2216.60 Lakhs for loanassistance under RIDF-V which were already cleared by the NABARD.

3. In the reference thirdread above, the Chief General Manager, NABARD, Mumbai has sanctioned loan assistance for 6Road Projects and 2 Bridge projects with an estimated cost of Rs.789.00 Lakhs pertainingto Roads and Buildings Deparatment under RIDF-V.

4. In the reference fifthread above, the Chief Engineer (R&B) NABARD has submitted proposals accordingly toaccord administrative sanction.

5. The Government aftercareful examinaltion of proposals of the Chief Engineer (R&B) NABARD, Hyderabad herebyaccord administrative sanction for 6 Road Projects costing Rs.565.00 Lakhs and 2 BridgeProjects costing Rs.224.00 Lakhs i.e. totally costing Rs.789.00 Lakhs (Rupees Sevenhundred and Eighty Nine Lakhs only) for loan assistance under RIDF-V which were alreadycleared by the NABARD, Mumbai as detailed in the Annexure-I and II appended to this order.

6. The expenditure on the above workssanctioned by the NABARD, shall be met from the following Head of Account during the nextfinancial year 2000-2001.

MH 5054 - Capital outlay on Roads and Bridges
04 - District and other Roads
MH 800 Other expenditure - Schemes included in the plan
SH (20) - Improvements of Roads and development of rural roads under RIDF-V (to be opened).

7. This order issues with the concurrenceof Finance and Planning (FW.EBS.XVII) Department vide their U.O.No.48821/952/Exp.PWD/99,dated: 20-1-2000.

(BY ORDER AND IN THE NAMEOF THE GOVERNOR OF ANDHRA PRADESH)

S.BHALERAO
SECRETARY TO GOVERNMENT

To
The General Manager, NABARD, Regional Office, 1-1-61/RTC "X" Roads, Hyderabad.
The Chief Engineer (R&B) NABARD, Hyderabad.
The Engineer-in-Chief (R&B) Roads, Hyderabad.

Copy to:
The D.S. to C.M.
P.S. to M(R&B).
All the Roads Sections.
The Finance & Planning (FW.EBS.XVII) Department.
The Finance & Planning (FW.BG) Departament.
SF/SC

//forwarded by order//

SECTIONOFFICER


A N N E X U R E -I

Annexure to the G.O.Ms.No.11, TR&B(R.I) Department, dated: 24-1-2000.

LIST OF ROAD WORKS CLEAREDBY THE NABARD UNDER RIDF-V

Sl.No. Name of the District/ Name of the Road Estimated Cost (Rs. in Lakhs)
  1. WARANGAL DISTRICT:  
1. Improvements to Purushotamaya gudem to Yellampet Road Via Ullampalli - Viswampalli from Km.3/6 to 9/6. 89-00
  II. KHAMMAM DISTRICT:  
1. Improvements to Annapureddy palli-Mulakalapalli road Km.4/0 to 10/0. 92-00
  III. KARIMNAGAR DISTRICT:  
1. Improvements to Vemulavada - Srikonda road in Km.14/0 to 21/0. 410-00
2. Improvements to Gollapalli - Aravelli road from Km.5/0 to 10/630 58-00
3. Improvements to Yellareddypeta - Marrimadal road Km.10/0 to 19/0 92-00
4. Improvements to Gumpala Yedulapur (Via) Kalwasrirampur Km.0/0 to 10/0. 124-00
 

Total :

565-00

S.BHALERAO
SECRETARY TO GOVERNMENT