GOVERNMENT OF
ANDHRA PRADESH
ABSTRACT
ILCS – ILCS scheme Stage-III – Construction of 5 lakh ILCS units in
Urban areas including 35,000 ILCS units for 7,000 schools in Municipal Areas
and 300 Community toilets at a project cost of Rs.250.00 Crores modified
administrative sanction and guidelines for execution – Orders – Issued.
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MUNICIPAL
ADMINISTRATION & URBAN DEVELOPMENT (W1) DEPARTMENT
G.O.Rt.No.825, MA. Dated: 17th June, 2003
Read the
following
1. G.O.Rt.No.724, M.A., dated
29.05.2003.
2. G.O.Rt.No.725, M.A., dated
29.05.2003.
3. U.O.No.188(4)/2003
of GA (Cabinet) Dept., dt. 08.06.2003-06-2003
***
O R D E R:
In the references 1st
and 2nd read above Government have sanctioned 5 lakh Integrated Low
Cost Sanitation Units (ILCS) and 300 Community toilets with HUDCO assistance in
all the Urban Local Bodies as listed in the Annexure-II & III as per the
targets indicated therein. The District wise targets of ILCS units are
indicated in Annexure-I. The guidelines for execution of the ILCS units are finalised
after detailed discussion held in the District Collectors Conference on 9th
–10th June, 2003.
2. The Government
after careful examination hereby accord modified administrative sanction for construction of 5 lakh ILCS Units in the
urban areas including 35,000 ILCS Units for 7,000 schools in Municipal areas at
a project cost of Rs.250.00 crores ( Rupees two hundred and fifty crores only) for implementing the scheme.
The guidelines as suggested by Director of Municipal Administration are
annexed to this order for
implementing by the agencies of
ILCS units and Community toilets in Urban Areas for strict compliance.
3. The Director of
Municipal Administration is requested to take necessary action accordingly.
(BY ORDER AND IN THE NAME OF
THE GOVERNOR OF ANDHRA PRADESH)
A.K.GOYAL,
Principal Secretary to Government
To
All the District Collectors / Joint Collectors in
the State (Through D.M.A).
The Director of Municipal Administration, A.P.,
Hyderabad.
The Commissioners of all the Municipal Corporations
in the State.
The Commissioners of all the concerned
Municipalities. (Through D.M.A)
The Regional Director-Cum-Appellate Commissioners of
Municipal Administration in the State. (Through
D.M.A)
The Engineer-in-Chief (P.H), A.C., Guards,
Hyderabad.
The Managing Director, APUFIDC Ltd., Hyderabad.
The Principal Secretary to the Chief Minister.
The General Administration (Cabinet) Department.
The P.S to M (MA).
The P.S to Principal Secretary to Government (AKG)
The P.S to Principal Secretary to Government (TC)
//forwarded
by order//
ANNEXURE TO G.O.Rt.No.825 Dated
17th June, 2003
1.
That the funds for 5.00 lakh ILCS units ie., 4,65,000
units for urban beneficiaries and 35,000 units to be constructed for schools in
municipal areas, will be placed at the disposal of District Collectors.
2.
The Cost of the ILCS unit will be Rs.4,500/-., of
which Rs.4275/- is loan and subsidy and Rs.225/- is the Beneficiary
contribution, which has to be collected by the Municipal Commissioner and paid
to the Construction agency.
3.
Collectors will constitute a committee at the District
level with Collector & District Magistrate as Chairperson, Joint Collector,
one Superintending Engineer(Civil), Municipal Commissioner of Headquarters
Municipality and other members as required by the Collector.
4.
Tenders will be called by the District Collector by
giving advertisement in at least one national news paper and one vernacular
state level daily. A short tender of 15
days will be called.
5.
The
Contractor has to be a Class-I Contractor.
6.
The
pre-fabrication of the ILCS unit by the construction agency may be done in
‘Nirmiti Kendras’ / any other suitable
location.
7.
The
District Collector to constitute a quality control cell at every ‘Nirmiti
Kendra’ site to ensure quality.
8.
The
agency will use an ISI mark lavatory Pan with ‘YEAR-2003’
embossed / permanently marked on it.
9.
The
agency will transport and erect the ILCS unit at his own cost.
10.
In
case of any change of beneficiaries, the Municipal Commissioner can do so with
the consent of the Regional Director of Municipal Administration.
11.
Collectors
must issue 100% pattas/verification certificates for the ILCS units by end of
June, 2003.
12.
300 Community toilets (3,000 seats) have been sanctioned for 30 urban
local bodies and the list is appended. The
Tender should include construction of Community toilets as well, for which
regular construction method/pre-fabrication can be followed.
13.
With
regard to construction of five ILCS
units in every urban school, it is clarified as follows:
i) ILCS units will be constructed in every
urban school, irrespective of which departmental control it comes under,
provided it is a Government / municipal school.
ii) The cost of 5 ILCS units, amounting to
Rs.20,000/- for every school is sanctioned as there will be a saving on common
internal walls and foundation.
iii) Education Department will be contributing
Rs.2,000/- per every school as beneficiary and infrastructure contribution.
iv) 5 members of school education committee will
be selected as 5 individual beneficiaries for every school. However, the beneficiaries will not be
responsible for repayment of loan, which will be borne by the MAUD Department.
v) Collectors must include these components of
school sanitation also in the tender notifications.
14. Mode of Payment:
a) Collectors to
ensure that there is no duplication of beneficiaries. A Register should be maintained with photographs of all the
beneficiaries and the ILCS units.
b) Payment
should be made only for the units, for which 100% check measurement is done by
the Assistant Engineer/Deputy Executive Engineer/Executive Engineer of the
Municipality. Collectors to assist by
giving additional engineers to complete check measurement in time.
c) This entire programme must be completed within a period
of six months, viz.,
(i) Construction of 35,000 school toilets @ 5 toilets per
school for 7,000 urban schools.
(ii) Construction of 4,65,000 ILCS units in all Urban Local
Bodies as per targets enclosed at Annexure-I & II.
(iii)
Construction
of 300 community toilets (3000 seats) in 30 Urban Local Bodies as per targets
enclosed at Annexure-III.
d) With regard to the 7 Municipal Corporations, viz.,
Hyderabad, Visakhapatnam, Vijayawada,
Rajahmundry, Guntur, Warangal and Kurnool the Commissioners of these
Corporations will undertake the construction under the same method of
tendering, which is going to be followed by the District Collectors.
Principal Secretary to Government
//TRUE COPY//
SECTION OFFICER
|
Sl.No. |
Name of the ULB |
No.of units sanctioned |
No.of seats proposed |
Total cost (Rs. In lakhs) |
|
1 |
2 |
3 |
4 |
5 |
|
1 |
Srikakulam |
10 |
100 |
40.00 |
|
2 |
Vizianagaram |
9 |
91 |
36.40 |
|
3 |
Parvathipuram |
3 |
30 |
12.00 |
|
4 |
Anakapalle |
11 |
110 |
44.00 |
|
5 |
Gajuwaka |
15 |
150 |
60.00 |
|
6 |
Rajahmundry |
44 |
440 |
176.00 |
|
7 |
Eluru |
14 |
140 |
56.00 |
|
8 |
Kakinada |
38 |
380 |
152.00 |
|
9 |
Amalapuram |
3 |
28 |
11.20 |
|
10 |
Palacole |
14 |
140 |
56.00 |
|
11 |
Tanuku |
3 |
30 |
12.00 |
|
12 |
Bhimavaram |
7 |
70 |
28.00 |
|
13 |
Tadepalligudem |
4 |
40 |
16.00 |
|
14 |
Narsarpu |
2 |
23 |
9.20 |
|
15 |
Vijayawada |
24 |
240 |
96.00 |
|
16 |
Machilipatnam |
2 |
20 |
8.00 |
|
17 |
Narsaraopet |
9 |
90 |
36.00 |
|
18 |
Ongole |
20 |
200 |
80.00 |
|
19 |
Guntur
Mpl. Corpn. |
2 |
20 |
8.00 |
|
20 |
Tadipatri |
9 |
90 |
36.00 |
|
21 |
Hindupur |
3 |
25 |
10.00 |
|
22 |
Cuddapah |
2 |
20 |
8.00 |
|
23 |
Proddatur |
10 |
100 |
40.00 |
|
24 |
Kurnool
Mpl. Corpn |
12 |
120 |
48.00 |
|
25 |
Nizamabad |
2 |
23 |
9.20 |
|
26 |
Nalgonda |
12 |
120 |
48.00 |
|
27 |
Suryapet |
7 |
70 |
28.00 |
|
28 |
Mahabubnagar |
3 |
30 |
12.00 |
|
29 |
Serilingampalle |
3 |
30 |
12.00 |
|
30 |
Kapra |
3 |
30 |
12.00 |
|
|
TOTAL |
300 |
3000 |
1200.00 |
A.K.GOYAL
Principal
Secretary to Government
'//TRUE